233kWh Liquid Cooled Commercial BESS for Grid-to-Off-Grid Commercial Energy Storage System

Product Summary
Voltertech 233kWh liquid-cooled C&I BESS with optional 100kW PCS, 20ms STS handover, grid/off-grid modes and 832V LiFePO4 battery. Designed for EPC teams planning commercial power transfer and backup load circuits.
Basic Properties
Place of Origin: China
Brand Name: Voltertech
Certification: IEC62477-1 , IEC61000-6/2/4 , UN3536
Model Number: BESS-233KWH-100KW-W-3
Trading Properties
Minimum Order Quantity: 1 Unit
Price: Negotiable
Payment Terms: L/C,T/T,Western Union
Supply Ability: 5000 Units per Month
Product Description

233kWh 100kW Liquid Cooled BESS for Grid-to-Off-Grid Systems

When utility power becomes unavailable, a commercial facility needs to know which electrical loads should remain supplied and how the power system will change operating modes. These questions are important when selecting a battery energy storage system for commercial backup and microgrid applications.

The Voltertech BESS-233KWH-100KW-W is a 233kWh liquid-cooled commercial energy storage system with an optional 100kW PCS configuration. The specification includes grid-connected and off-grid operation, a 20ms STS handover time and communication interfaces for supported system integration.

Planning Essential Loads for Commercial Backup

Not every electrical circuit in a commercial building needs battery backup. Lighting, communication equipment, security systems and selected operational loads may have different power requirements and outage tolerances.

Before selecting the system, engineers should identify essential and non-essential loads, calculate their simultaneous demand and evaluate motor starting currents where applicable.

The available backup power depends on the selected PCS configuration, battery operating limits and approved electrical design. A 100kW PCS rating should not be interpreted as confirmation that every connected load can be supported under all operating conditions.

Grid-to-Off-Grid Transfer with STS

The hybrid BESS specification lists a 20ms STS handover time for supported power transfer operations. This parameter is relevant when designing transitions between grid-connected and off-grid operating modes.

However, a 20ms transfer time does not guarantee uninterrupted operation for every electrical load. Computers, process controllers and other sensitive equipment may have different ride-through requirements.

EPC contractors should confirm the approved switching sequence, applicable operating conditions and equipment configuration before specifying the system for critical power applications.

Optional 100kW PCS and System Configuration

The system uses 233kWh of nominal LiFePO4 battery energy with an 832V battery architecture. Its operating voltage range is 702–936V.

The optional PCS is rated at 100kW for the listed grid-connected and off-grid configurations. Project engineers should confirm the PCS, STS, protection equipment and required control functions in the final supply scope.

Grid supply, solar PV and diesel generator arrangements can be evaluated according to the project requirements and the supported hybrid system design.

System Communication and Commissioning

The BESS provides LAN, RS485 and CAN communication interfaces. These connections allow system integrators to evaluate communication requirements among compatible battery, power conversion and monitoring equipment.

Commissioning should include electrical inspections, battery and PCS communication checks, protection verification and tests of the intended operating transitions.

For backup projects, transfer testing should be conducted with appropriate procedures and representative loads before system handover.

Technical Specifications

Parameter Specification
Rated Battery Energy 233kWh
PCS Rated Power 100kW (Optional)
Battery Chemistry / Capacity LiFePO4 / 280Ah
Nominal Battery Voltage / Range 832V / 702–936V
Grid AC Voltage / Frequency 380/400V / 50/60Hz
STS Handover Time 20ms (Specified)
Cooling / Protection Rating Liquid Cooling / IP54
Cycle Life / Calendar Life 8,000 Cycles / 15 Years
Communication LAN / RS485 / CAN
Dimensions / Net Weight 1385 × 910 × 2203mm / Approx. 2300kg

Applications for Commercial Backup Power

The 233kWh BESS can be evaluated for commercial buildings, warehouses, industrial facilities and remote power projects requiring planned transitions between grid-connected and off-grid operation.

Actual suitability depends on the electrical load schedule, permitted switching arrangement, energy requirements and final power conversion configuration. Additional protection may be required for loads that cannot tolerate a short supply interruption.

Frequently Asked Questions

1. Can this BESS automatically switch from grid-connected to off-grid operation?

The specification includes grid-connected and off-grid modes with a 20ms STS handover time. Automatic transfer logic and operating conditions must be confirmed for the selected PCS, STS and control configuration.

2. Is a 20ms transfer suitable for sensitive electronic equipment?

Suitability depends on the equipment's allowable interruption time. Sensitive or mission-critical equipment may require dedicated UPS protection or other additional measures.

3. Can the system supply all loads in a commercial building during an outage?

This depends on the simultaneous electrical demand, motor starting requirements and PCS output capability. Engineers should identify which loads require backup before finalizing the system.

4. Is the 100kW PCS included in the standard cabinet?

The supplier parameter sheet lists the PCS as optional. The final quotation should clearly identify the PCS, STS and any additional equipment included in the supply.

5. What project information is needed for technical evaluation?

Please provide the electrical single-line diagram, essential load schedule, site grid voltage, required backup duration and intended switching arrangement. Details of existing solar or generator equipment are also useful.

Planning a Grid-to-Off-Grid Commercial BESS Project?

Voltertech provides commercial battery energy storage solutions for EPC contractors, solar installers and microgrid integrators. Share your load schedule, operating requirements and electrical diagram to discuss compatible equipment configurations and quotation options.

Request BESS Configuration & Quotation
Product Details
Highlight:

Grid-to-Off-Grid Commercial BESS

,

Liquid Cooled Commercial Energy Storage System

,

233kWh Commercial Battery Energy Storage System

Product Positioning: Grid-to-Off-Grid Commercial BESS
Target Buyers: Microgrid EPCs / ESS Integrators
Main Application: Commercial Backup Power Planning
Power Architecture: Grid / Battery / Hybrid Sources
Switching Design: Power Transfer Coordination
Load Planning: Essential / Non-Essential Circuits
Commissioning Focus: Transfer Testing & System Protection
Project Documents: Load Schedule / SLD / Operating Plan

Customer Service

Related Products
Send An Inquiry