What Is Load Shifting in Battery Energy Storage?

2026/11/09
Latest company blog about What Is Load Shifting in Battery Energy Storage?

COMMERCIAL BESS ENERGY MANAGEMENT GUIDE

Electricity does not always have the same value throughout the day. A business may have low electricity prices overnight, abundant solar energy at noon and much higher electricity costs in the evening.

Battery load shifting uses energy storage to move electricity from one time period to another. The battery charges when energy is cheaper or more available, then discharges when that stored energy is more useful.

Quick Answer

Load shifting means charging a battery during one period and using that stored energy during another. In a commercial BESS, this may mean charging during low-cost grid hours or from surplus daytime solar, then discharging during higher-cost periods or when site demand is greater.

How Does Battery Load Shifting Work?

The principle is easier to understand by looking at a normal operating day.

01:00–05:00 Electricity prices may be lower. The battery can charge from the grid if the tariff and system strategy support it.
10:00–14:00 Solar PV may generate more electricity than the site currently needs. Surplus solar can charge the battery.
17:00–21:00 Solar production falls while site demand or electricity prices may remain high. The BESS discharges.
Later The battery stops discharging when it reaches its minimum SOC or the scheduled high-value period ends.

The important point is that the battery does not create additional energy. It changes when energy is available for use.

Why Do Businesses Use Load Shifting?

The business case usually comes from a mismatch between when energy is available and when it is most valuable.

Time-of-Use Electricity Rates Charge during lower-price periods and discharge during higher-price periods when the tariff difference is large enough to justify cycling the battery.
Solar Energy Shifting Store surplus daytime PV generation and use it later when solar output falls but the facility is still consuming electricity.
Reduce Evening Grid Use Stored energy can reduce dependence on grid electricity during selected high-cost operating periods.
Flexible Energy Management The same BESS may combine load shifting with other functions such as peak shaving or backup reserve when the control strategy allows it.

Load Shifting vs Peak Shaving: What Is the Difference?

These two terms are often used together, but they solve different problems.


Load Shifting Peak Shaving
Main Goal Move energy use from one time period to another Reduce the highest grid-demand level
Usually Targets Energy cost in $/kWh Demand or capacity cost related to kW
Charging Typically during lower-cost or high-solar periods Before the expected demand peak
Discharging During higher-value energy periods When site demand exceeds a target level
Main Sizing Driver Energy required across the shifting period Peak reduction in kW and how long the peak lasts

For example, a facility may use load shifting to move 300kWh of energy from midday to the evening. The same site could also use the battery for peak shaving when a short production spike pushes grid demand above a target.

For a detailed explanation of the second strategy, read how battery peak shaving works .

Example 1: Time-of-Use Load Shifting

Commercial Site Example

Suppose a business has:

  • Lower electricity price before 06:00
  • Higher electricity price from 17:00 to 21:00
  • Average evening load to be shifted: 75kW
  • Target shifting period: 3 hours

The theoretical usable battery energy required for that period is:

75kW × 3 hours = 225kWh

The rated battery capacity would need to be higher after allowing for usable depth of discharge, system efficiency and the required SOC reserve.

Example 2: Shifting Solar Energy Into the Evening

Load shifting does not have to mean charging from the grid.

Consider a factory with rooftop solar. At noon, the PV array produces 250kW while the facility is using only 180kW.

Approximately 70kW of solar power may be available for battery charging, subject to the charging limits of the BESS.

Later in the evening, the factory still operates but solar production has fallen close to zero. The battery can then return part of the stored daytime energy to the site.

Solar load shifting moves energy from when the sun produces it to when the facility actually needs it.

How Much Battery Capacity Is Needed for Load Shifting?

For an early estimate, start with the amount of power you want to shift and how long you need to shift it.

Required Usable Energy ≈ Shifted Load (kW) × Duration (hours)

Then allow for:

  • Usable depth of discharge
  • PCS and system efficiency
  • Minimum SOC reserve
  • Battery degradation over time
  • Expected variation in site load

A battery selected only by nominal kWh can therefore be misleading.

Why Charging Power Matters Too

A battery may have enough kWh for the evening discharge period but still be poorly matched if it cannot recharge within the available charging window.

Suppose 240kWh needs to be restored during a four-hour low-cost period.

240kWh ÷ 4 hours = 60kW Average Charging Power

The PCS, battery and charging source must be able to support the required charging rate.

If the charging window is only two hours, the required average charging power would be much higher.

When Does Time-of-Use Storage Make Sense?

Load shifting is not automatically profitable simply because electricity prices change during the day.

The price difference needs to be large enough to cover the cost of charging losses and battery cycling.

A useful project review should consider:

  • Off-peak electricity price
  • Peak electricity price
  • Number of shifting cycles per year
  • Round-trip efficiency
  • Usable battery capacity
  • Battery degradation
  • System investment
  • Operating and maintenance costs

The correct question is therefore not only “What is the peak electricity price?” but also “How much energy can realistically be moved into that period?”

What Role Does the EMS Play?

The battery does not decide by itself when electricity is expensive or when surplus solar is available.

An Energy Management System or other system controller can use information such as:

  • Time-of-use tariff periods
  • Battery SOC
  • Site load
  • Solar generation
  • Grid conditions
  • Backup reserve requirements

Based on the operating strategy, the system can schedule when the battery should charge, wait or discharge.

Can Load Shifting and Backup Use the Same Battery?

Yes, but the system has to balance two competing priorities.

If the battery is discharged deeply every evening to reduce electricity costs, there may be less stored energy available if a grid outage happens immediately afterward.

A project that values backup reliability may therefore keep a minimum SOC reserve.

Example

A 300kWh BESS does not necessarily make all 300kWh available for daily load shifting.

Part of the battery may be reserved for backup, while the remaining usable capacity is available for daily energy management.

Can One BESS Do Load Shifting and Peak Shaving?

Yes. In many commercial projects, these functions can be combined.

For example, a battery might:

  • Charge from surplus solar around midday
  • Hold enough SOC for the expected afternoon peak
  • Discharge briefly to reduce the peak
  • Use remaining stored energy during a higher-price evening tariff period

The challenge is scheduling the battery so one application does not leave insufficient energy for another.

This is where the control strategy becomes as important as the battery capacity itself.

When Is Load Shifting a Poor Fit?

Not every site needs a time-shifting BESS.

The project may be less attractive when:

  • Electricity prices change very little throughout the day
  • There is little surplus solar energy
  • The high-price window is very long
  • The battery would need to cycle heavily for a very small price difference
  • The facility's load already occurs mainly during low-cost periods
  • The available charging window is too short

In those cases, another BESS application such as peak shaving or backup may provide more value.

What Data Should You Prepare Before Sizing a Load-Shifting BESS?

For a useful project assessment, collect:

Electricity Tariff Hourly or time-of-use energy prices, including the start and end of each tariff period.
Load Profile Preferably 15-minute or hourly site demand data.
Solar Generation PV capacity and hourly production profile if solar charging is planned.
Energy to Shift How many kWh should be moved into the target period each day.
Charging Window How much time is available to restore battery energy before the next discharge.
Other BESS Functions Peak shaving, backup or generator coordination that may need to share the same battery.

Commercial BESS for Load Shifting

The right load-shifting system depends on both power and energy.

The PCS must provide enough kW for the target load, while the battery must provide enough usable kWh for the full shifting period.

You can browse the Voltertech Commercial Energy Storage System range for different C&I battery storage configurations.

For a real project, however, the best starting point is the site's hourly load and tariff data rather than selecting a BESS from catalogue capacity alone.

Frequently Asked Questions

FAQ 01

What is battery load shifting?

Battery load shifting means storing electricity during one time period and using it during another, such as charging during low-cost hours and discharging during higher-cost hours.

FAQ 02

What is the difference between load shifting and peak shaving?

Load shifting primarily moves energy in kWh between time periods, while peak shaving focuses on reducing the highest grid power demand in kW.

FAQ 03

Can a BESS charge at night and discharge during the day?

Yes, if the inverter, battery and control strategy support grid charging. This can be useful where electricity is cheaper during off-peak hours and more expensive later.

FAQ 04

Can solar energy be shifted from daytime to nighttime?

Yes. Surplus daytime PV generation can charge the battery and the stored energy can later support evening or nighttime loads.

FAQ 05

How much battery is needed for load shifting?

Start by multiplying the average load you want to shift by the required number of hours. Then allow for usable depth of discharge, efficiency, reserve and other operating requirements.

FAQ 06

Does load shifting reduce total electricity consumption?

Not necessarily. Its main purpose is to change when electricity is supplied or purchased. In practice, battery conversion losses mean slightly more energy may be required to deliver the same usable output.

Load Shifting Is About Timing, Not Just Battery Capacity

The value of BESS load shifting comes from using stored energy at a more useful time.

That might mean moving low-cost grid electricity into an expensive tariff period, moving midday solar into the evening, or combining both strategies.

The best projects start with three things: the load profile, the tariff schedule and the available charging window.

Once those are clear, the required battery kWh, PCS kW and operating strategy can be defined much more accurately.