1.725MW 10kV Transformer-Isolated PCS Container Power Conversion System for Medium Voltage Substation Tie-In

Product Summary
Voltertech 1.725MW / 10kV AC-side PCS container with transformer isolation, 1000–1500V DC range and 1725kVA AC output. Built for EPC teams planning MV switchgear interfaces, cable routing, electrical protection and substation tie-in documentation.
Basic Properties
Place of Origin: China
Brand Name: Voltertech
Certification: IEC62477-1 , IEC61000-6/2/4 , UN3536
Model Number: BESS-1725MW-W-3
Trading Properties
Minimum Order Quantity: 1 Unit
Price: Negotiable
Payment Terms: L/C,T/T,Western Union
Supply Ability: 5000 Units per Month
Product Description

1.725MW 10kV PCS Container for Medium Voltage Substation Integration

Connecting a battery energy storage power conversion system to a medium-voltage substation requires coordination between the PCS supplier, electrical contractor and site operator. Switchgear capacity, cable termination, protective relays and grounding arrangements should be reviewed before installation.

The Voltertech BESS-1725MW-W is a 1.725MW-class AC-side power conversion container with a rated 1725kVA, 10kV interface and transformer isolation. Designed for large energy storage projects, it provides a medium-voltage power conversion solution for EPC contractors planning new or existing substation connections.

MEDIUM-VOLTAGE PROJECT INTERFACE

DC-Side Conversion: 1725kW Rated Power

AC-Side Connection: 1725kVA / 10kV

Isolation Architecture: Transformer Isolation

Coordinate the PCS and Substation Connection Scope

A rated 10kV output does not automatically confirm that the complete switchgear, feeder protection or site cabling is included with the power conversion container. The supply boundary should be established during technical procurement.

PCS Equipment Review

Power conversion ratings

Transformer-isolated architecture

Approved connection drawings

Equipment communication interfaces

Site Electrical Review

MV switchgear arrangement

Feeder and cable routing

Protection and earthing design

Substation installation clearances

Four Checks Before a 10kV Substation Tie-In

01 — Review the Existing MV Single-Line Diagram

Confirm the proposed connection point, available switchgear capacity, transformer arrangement and relevant protection requirements. A nominal 10kV voltage match alone is not sufficient to approve a grid connection.

02 — Approve MV Cable and Termination Details

The EPC contractor should obtain the approved termination drawing and verify cable routing, connection positions, insulation requirements and available access. Cable size and termination accessories must be selected using confirmed electrical ratings and site conditions.

03 — Coordinate Protection and Earthing

Transformer isolation is part of the specified PCS architecture, but project-specific short-circuit studies, protective relay coordination and earthing arrangements remain necessary. Final settings must follow the approved electrical design.

04 — Prepare the Substation Interface Documents

Before delivery, confirm the electrical drawings, cable schedule, equipment arrangement, protection responsibilities and required communication interfaces. These documents help reduce integration issues between the PCS supplier and the site electrical contractor.

Communication Between Battery, PCS and Substation Control

The BESS-1725MW-W provides CAN and RS485 battery communication interfaces, with Modbus RTU, Modbus TCP and IEC 60870-5-104 listed for dispatch communication.

For substation projects, engineers should confirm which equipment supplies each control signal, how status information is reported and which operating commands are supported.

Communication availability should not be interpreted as automatic compatibility with every utility SCADA or plant controller. Protocol mapping and permitted control functions must be verified during project integration.

Core Technical Specifications

Parameter Specification
Rated DC Power 1725kW (1.725MW)
DC Operating Voltage 1000–1500V
Maximum DC Current 1808A
Rated AC Apparent Power 1725kVA
Rated AC Voltage 10kV
Isolation Mode Transformer Isolation
Power Factor / THD -1 to +1 Adjustable / ≤3% at Rated Power
Battery Communication CAN / RS485
Dispatch Communication Modbus RTU / Modbus TCP / IEC 60870-5-104
Dimensions / Net Weight 6058 × 2438 × 2896mm / Approx. 9000kg

Container Placement Near an MV Substation

The PCS container measures 6058 × 2438 × 2896mm and weighs approximately 9 tonnes. The project layout should provide suitable equipment access, cable routes, maintenance space and structural support.

When an existing substation is being upgraded, the contractor should also consider construction access and the practical arrangements for connecting new power equipment to operating electrical infrastructure.

The final location and connection design must follow approved equipment drawings and applicable medium-voltage installation requirements.

MV Substation Integration FAQs

Q1. Does the PCS container include the external 10kV switchgear and circuit breaker?

The available specification confirms transformer isolation and a 10kV AC interface, but it does not fully define the external switchgear supply scope. Buyers should request a detailed equipment list and connection diagram before ordering.

Q2. Where should the medium-voltage cables enter the container?

Cable-entry positions and termination details should be confirmed from the supplier's approved installation drawings. They should not be inferred from exterior product photos or the container dimensions.

Q3. Can this PCS share an existing 10kV feeder with other power equipment?

This depends on feeder capacity, fault levels, protection coordination, operating requirements and the proposed connection arrangement. The responsible engineer must review the complete system before approving a shared connection.

Q4. Does transformer isolation eliminate the need for site earthing and relay coordination?

No. Transformer isolation is part of the equipment architecture, but appropriate earthing, protective devices and coordinated relay settings are still required for the complete medium-voltage installation.

Q5. What should an EPC contractor provide for a substation connection review?

Useful documents include the existing 10kV single-line diagram, switchgear information, transformer details, available connection point, cable route plan, protection requirements and proposed PCS installation layout.

Planning a 1.725MW PCS Connection to a 10kV Substation?

Share your medium-voltage single-line diagram, switchgear arrangement, cable routing requirements and project location with Voltertech. Our team can discuss the relevant PCS specifications, interface documents and quotation requirements.

Request PCS Integration Details & Quotation
Product Details
Highlight:

1.725MW PCS Container

,

10kV Power Conversion System

,

Transformer-Isolated Energy Storage PCS

Project Scale: Large-Scale Energy Storage Projects
Installation Format: Containerized Power Equipment
Product Role: MW-Class Energy Storage Power Conversion
Control Integration: EMS / Dispatch Communication
Battery Integration: High-Voltage DC Battery Interface
Grid Integration: Medium-Voltage AC Coupling
Electrical Architecture: Transformer-Isolated AC Side
Target Buyers: Utility EPCs / MV System Integrators
Product Positioning: MV Substation-Integrated PCS
Main Application: BESS Substation Connection
Grid Connection Planning: MV Switchgear & Feeder Review
Cable Engineering: MV Termination & Routing Assessment
Protection Coordination: Relays / Fault Levels / Earthing
Installation Planning: PCS Container & Substation Layout
Project Documentation: SLD / Cable Schedule / Interface Drawings

Customer Service

Related Products
Send An Inquiry